The new 332,150 SF center is a 5-story structure with 212,750 SF of parking integrated on three levels. It sits on 5.7 acres at 100 Civic Center Way adjacent to City Hall. The state-of-the-art facility has administrative and operational space for all police divisions, a joint police and fire emergency operations center, community meeting room, modern communications and dispatch center, indoor firing range, crime laboratory, property processing and storage area, short-term custody facility, a central data center, vehicle maintenance facilities and parking for 661 police and city staff (572 parking spaces in five-story parking structure and 89 surface parking spaces).
It meets LEED Gold standards with the installation of energy-efficient IT and AV equipment to reduce energy consumption. It includes an energy-efficient mechanical system, natural ventilation, solar power, an efficient lighting system and other renewable energy features.
Structural Engineer
BWE
Civil Engineer
BWE
Land Surveyor
BWE
Оwner
City of El Cajon
Architect
KMA Architecture & Engineering
Completion Date
2011
Construction Cost
$40 Million
LEED Certification
LEED Gold Certified