ENGINEERED TO EXCEED EXPECTATIONS

Gateway at Torrey Hills

Office | Parking Structure | LEED

BWE provided design services for two Class-A, four-story steel, moment frame buildings, central plant, and parking structure. The 200,000 SF project features stone tile, green glass, and metallic aluminum elements arcing along the exterior facades. Each building has been strategically positioned on the 7.7-acre site to provide maximum freeway visibility and signage and panoramic views of the ocean and Torrey Pines Reserve. This project includes a fully-equipped fitness center, state-of-the-art technology infrastructure, multiple patios and gathering areas, and a waterfall. The four-level parking structure retains a 40′ slope and can accommodate 700 cars. The 30-foot stainless steel sculpture, titled “Dancing in the Sun,” reflects the sun’s rays so they appear to be dancing off the sculpture’s grind marks.

  • Structural Engineer

    BWE

  • Оwner

    Cisterra

  • Architect

    Brian Paul Architects

  • Completion Date

    2008

  • Construction Cost

    $83 Million

  • LEED Certification

    LEED Silver Certified