Gateway at Torrey Hills
Office | Parking Structure | LEED

BWE provided design services for two Class-A, four-story steel, moment frame buildings, central plant, and parking structure. The 200,000 SF project features stone tile, green glass, and metallic aluminum elements arcing along the exterior facades. Each building has been strategically positioned on the 7.7-acre site to provide maximum freeway visibility and signage and panoramic views of the ocean and Torrey Pines Reserve. This project includes a fully-equipped fitness center, state-of-the-art technology infrastructure, multiple patios and gathering areas, and a waterfall. The four-level parking structure retains a 40′ slope and can accommodate 700 cars. The 30-foot stainless steel sculpture, titled “Dancing in the Sun,” reflects the sun’s rays so they appear to be dancing off the sculpture’s grind marks.




Structural Engineer | BWE |
Оwner | Cisterra |
Architect | Brian Paul Architects |
Completion Date | 2008 |
Construction Cost | $83 Million |
LEED Certification | LEED Silver Certified |