Long Beach City College Math & Technology Building
Higher Education | Design-Build | LEED

A new 1-story technology building and a 2-story classroom building approximately 71,000 SF. These buildings have been designed to achieve LEED Platinum certification and include native, drought-tolerant plants, as well as the use of recycled materials and permeable pavements. The Math Department, Reprographics Department and the Culinary Arts Department featuring a commercial grade kitchen and restaurant are included in these buildings.
Structural Engineer | BWE |
Owner | Long Beach Community College District |
Architect | Sillman Wright Architects |
Completion Date | 2015 |
Construction Cost | $32.4 million |
Awards | Award of Distinction by the Design-Build Institute of America – Western Pacific Region (DBIA-WPR) |
LEED Certification | Leed Platinum Certified |