P-114 MV-22 Double Hangar Replacement
Military | Design-Build

A 1-story double hangar building enclosing approximately 60,000 SF with a 2-story maintenance/administrative space enclosing approximately 30,000 SF on each level. The roof framing of the hangar bay is a large, 326 FT custom steel truss that supports a 7-ton capacity bridge crane. The building is supported on a deep foundation system. Civil engineering was provided for a new concrete apron, stormdrain system re-routing, new wet utilities connections, and temporary tow way re-alignment. Stormwater quality LEED aspects were incorporated in to the design.
Structural Engineer | BWE |
Civil Engineer | BWE |
Land Surveyor | BWE |
Owner | US Navy |
Architect | KMA Architecture & Engineering |
Completion Date | 2015 |
Construction Cost | $35.9 Million |