Spruce Street Bridge Rehabilitation
Bridge | Civic | Rehabilitation | Renovations

Conducted the investigation, analysis, plans and specifications for the renovation of this steel cable-stayed pedestrian bridge with two laced-steel towers at each end of the span, pressure-treated wood deck and longitudinal weathering steel tube girders.
Structural Engineer | BWE |
Owner | City of San Diego |
Completion Date | 1985 |
Construction Cost | $175K |