Spruce Street Bridge Rehabilitation
Bridge | Civic | Rehabilitation | Renovations

Conducted the investigation, analysis, plans and specifications for the renovation of this steel cable-stayed pedestrian bridge with two laced-steel towers at each end of the span, pressure-treated wood deck and longitudinal weathering steel tube girders.
| Structural Engineer | BWE |
| Owner | City of San Diego |
| Completion Date | 1985 |
| Construction Cost | $175K |

