Conducted the investigation, analysis, plans and specifications for the renovation of this steel cable-stayed pedestrian bridge with two laced-steel towers at each end of the span, pressure-treated wood deck and longitudinal weathering steel tube girders.
Structural Engineer
BWE
Оwner
City of San Diego
Completion Date
1985
Construction Cost
$175K