ENGINEERED TO EXCEED EXPECTATIONS

Spruce Street Bridge Rehabilitation (c. 1917)

Bridge | Civic | Rehabilitation | Renovations

Conducted the investigation, analysis, plans and specifications for the renovation of this steel cable-stayed pedestrian bridge with two laced-steel towers at each end of the span, pressure-treated wood deck and longitudinal weathering steel tube girders.

  • Structural Engineer

    BWE

  • Оwner

    City of San Diego

  • Completion Date

    1985

  • Construction Cost

    $175K