UCSD Health Sciences Biomedical Research Facility II

UCSD Health Sciences Biomedical Research Facility II

High Education | Biotechnology A 5-story research/laboratory facility on a 3.3-acre site on the Medical School campus at UCSD. It provides 196,000 SF of research and support space for Health Sciences needed to advance major interdisciplinary programs, including Medical Genomics. In addition it provides research space for new faculty in Pediatrics, Neurosciences, Reproductive Medicine and…

UCSD Biomedical Library

UCSD Biomedical Library

Higher Education | Library Civil Engineering and Surveying. This $17 million project was a major transformation of the existing facility with a large new addition and renovation of the existing building. The existing unique and distinctive roof design was preserved and enhanced by the addition. BWE provided both the civil engineering and surveying services. Civil…

UCSD Athena Parking Structure

UCSD Athena Parking Structure

Parking Structure | LEED A new parking structure at the East Campus of UCSD. The structure will includes 1,200 parking spaces, a cafe and two, 1,200,000 gallon above-ground Thermal Energy Storage tanks. The tanks are structurally independent, yet architecturally integrated with the parking structure. Civil Engineer BWE Land Surveyor BWE Owner University of California, San…

Township 14

Township 14

Office | Renovations Design services for a new 3-story office building over one level of subterranean parking and the renovation of an existing office building. The new building is approximately 70,000 SF. The renovation of the existing 57,020 SF building entailed reconfiguration of the lobby, new curtain wall, a 2-story monumental lobby staircase, cafe, fitness center…

Torrey Reserve

Torrey Reserve

Office | Parking Structure | Commercial Structural services were provided for the five main office buildings in this nine building development totalling approximately 431,000 SF of office space. The facilities have a cafeteria/restaurant, fitness room with lockers and showers for employees and a board room equipped with video screens, full height atriums with skylights and…

Torrey Point

Commercial | Office A commercial development consisting two Class A office buildings. 3-story and 2-story, with 57,000 SF and 34,000 SF, respectively. The campus offers 1-level of below grade parking, surface parking, a bistro, fitness center with locker rooms and showers, and bike storage. The floor-to-ceiling windows provide unobstructed views of Torrey Pines State Park…

Sysco Poway

Sysco Poway

Industrial BWE provided civil engineering and surveying services for the entire 42 acre site over three phases which included 340,355 SF of food storage, distribution and office space. Civil Engineer BWE Land Surveyor BWE Completion Date 2012

Sunroad Corporate Centre

Sunroad Corporate Centre

Commercial | Office Full design services were provided for buildings II, III, IV and the East & West parking structures. Each office building is a 95,000 SF 3-story steel moment frame over a 27,500 SF single-level of basement parking. Additional elevated-level parking structures were also constructed, one of which is a single-level structure at a…

St. Augustine High School

K-12 Schools Addition of new athletic facilities, gymnasium, performing arts & theater center and parking structure (with practice field on the deck above) on the existing 7.5 acre private school campus. The gymnasium will accommodate 1,500 seats. The performing arts & theater center will accommodate 400 seats. Total building SF will be 48,500. The sports…

Spruce Street Bridge Rehabilitation

Spruce Street Bridge Rehabilitation

Bridge | Civic | Rehabilitation | Renovations Conducted the investigation, analysis, plans and specifications for the renovation of this steel cable-stayed pedestrian bridge with two laced-steel towers at each end of the span, pressure-treated wood deck and longitudinal weathering steel tube girders. Structural Engineer BWE Owner City of San Diego Completion Date 1985 Construction Cost…