Camp Pendleton Brig Renovation and New Riot Gear Storage Building
Military | Design-Build

The brig, a 2-story, 65,271 SF pre-trial holding/detention facility, was updated throughout. The roofing, electrical, lighting, HVAC, security, fire alarm, telecom and public address systems were included in the upgrades, as well as minor structural and landscape improvements. The new, 1-story riot gear storage building was constructed out of CMU block and metal roofing.
Structural Engineer | BWE |
Civil Engineer | BWE |
Land Surveyor | BWE |
Owner | US Navy |
Architect | KMA Architecture & Engineering |
Completion Date | 2012 |
Construction Cost | $5.6 Million |