The brig, a 2-story, 65,271 SF pre-trial holding/detention facility, was updated throughout. The roofing, electrical, lighting, HVAC, security, fire alarm, telecom and public address systems were included in the upgrades, as well as minor structural and landscape improvements. The new, 1-story riot gear storage building was constructed out of CMU block and metal roofing.
Structural Engineer
BWE
Civil Engineer
BWE
Land Surveyor
BWE
Оwner
US Navy
Architect
KMA Architecture & Engineering
Completion Date
2012
Construction Cost
$5.6 Million